The 10-point IT AMC provider checklist
| # | What to check | Question to ask |
|---|---|---|
| 1 | Written scope of work | Which devices, systems and services are covered — and which are excluded? |
| 2 | SLA | What are the response and resolution times for each priority level? |
| 3 | Spare parts | Are parts included? Genuine or compatible? How fast can they be sourced in the UAE? |
| 4 | On-site coverage | Which emirates are covered, and are there travel charges outside Dubai? |
| 5 | Preventive maintenance | How often are visits, and what is checked on each visit? |
| 6 | Security and backup | Who manages patching, antivirus/EDR and backup — and are restores tested? |
| 7 | Reporting | Will you receive monthly reports, ticket history and an asset register? |
| 8 | Team and escalation | Who is the named account manager, and how do escalations work? |
| 9 | Certifications and vendors | Which vendor certifications do the engineers hold for your equipment? |
| 10 | Contract and exit terms | What is the notice period, and how are passwords and documentation handed over? |
How can businesses identify reliable IT AMC companies in Dubai?
- Ask for 2–3 client references with a similar size and setup, and call them.
- Check reviews on Google Business Profile and how the company responds to complaints.
- Confirm the company has its own engineers in the UAE rather than subcontracting everything.
- Look for a ticketing system, named account manager and written escalation path.
- Ask how long they have supported AMC clients and what their renewal rate is.
What trade licence, approvals and certifications should an IT AMC provider in the UAE hold?
| Check | What to look for |
|---|---|
| Trade licence | A valid licence from the Department of Economy and Tourism (Dubai), another emirate's economic department or a free zone authority, with activities covering IT/computer maintenance and support. Ask for a copy and check the expiry date. |
| VAT registration | A Tax Registration Number (TRN) on the quotation if the provider charges VAT. Registration is mandatory above AED 375,000 annual taxable supplies. |
| Company certifications | ISO 9001 (quality management) and ISO/IEC 27001 (information security) are good signs, especially if they will handle your data. |
| Vendor partnerships | Partner status with the brands you use — e.g. Microsoft, Dell, HP, Lenovo, Cisco, Fortinet or Sophos — for parts and escalation. |
| Engineer certifications | Current certifications relevant to your systems, such as Microsoft, Cisco CCNA, Fortinet NSE or CompTIA. |
Free-zone companies may face restrictions on serving clients outside their zone; confirm that the provider is permitted to deliver on-site services at your location.
What should be in an IT AMC scope of work?
A good scope lists every covered device with its type and location, the services included (helpdesk, on-site support, patching, backup monitoring, preventive visits), the support hours, and the exclusions. If two quotes cover different equipment, they are not comparable.
Why does a site survey matter before signing?
A site survey or IT audit lets the provider see your actual equipment, its age and any existing problems. Quotes made without one are often adjusted later or exclude issues found after signing.
What are the warning signs of an unreliable IT AMC provider?
- No written SLA, or response times without resolution targets
- A single lump-sum price with no device list
- "Unlimited support" with no definition of what is covered
- No mention of backup, security or reporting
- Long lock-in periods or unclear handover terms
- The provider keeps admin passwords without sharing them with you
Before signing, run through our IT AMC contract checklist of questions to ask.
How can businesses compare IT AMC quotations from different providers?
- Give every provider the same device list and requirements.
- Ask for prices split by device type, SLA and add-ons.
- Check whether quotes include 5% VAT.
- Compare comprehensive vs non-comprehensive cover like for like.
- Benchmark against typical Dubai AMC prices.
How long does it take to start an IT AMC?
Typically a site survey and IT audit take a few days, followed by onboarding — documenting systems, setting up monitoring and remote access, and agreeing escalation contacts — during the first 2–4 weeks.